|
Last Updated:
2004-09-29 [AW]
- Tool chain used for build
- Performance
- New features
- Improvements
- Program corrections
- Known problems
- Release history
- Miscellaneous
The following tools have been used:
Fujitsu Softune Workbench V60L03
Compiler: Fujitsu FCC911s V60L03
Assembler: Fujitsu FASM911s V60L03
Librarian: Fujitsu FLIBs V60L01
- Task switch time
Release Library: 20.5 us = 984 CPU clock cycles
- Interrupt latency of fast interrupts
Zero
- Interrupt latency of low priority interrupts
Release Library: 9.25 us = 444 CPU clock cycles
Absolute timings are measured on an MB91F362 running at 48 MHz CPU clock
Version 3.22a
- Zero Latency, Fast interrupts
Since version 3.22a, embOS for FR series supports zero latency for interrupts running with high priority.
- OS_PutMailFront() / OS_PutMailFront1
New mailbox functions to enable LIFO behavior of mailboxes.
- OS_PutMailFrontCond() / OS_PutMailFrontCond1()
New conditional mailbox functions to enable LIFO behavior of mailboxes.
Version 3.20
- OS_Suspend() / OS_Resume() implemented
New functions to suspend and resume tasks unconditionally.
- Fixed size memory blocks inplemeted
New functions to allocate fixed size memory blocks from embOS.
Version 3.10k
NONE. Initial release
Version 3.10k
NONE. Initial release
Version 3.10k
NONE. Initial release
None
| Version |
Release date |
Short explanation |
| V3.22a |
29. Sep 2004 |
new embOS sources 3.22a, support for Softune V6 |
| V3.10k |
03. Feb 2003 |
Version 3.10k released |
This document was first released with version 3.10k of the software.
Software released earlier is documented internally.
This information is available at request.

Copyright SEGGER Microcontroller GmbH & Co.KG.
All rights reserved.
For more information, please visit our web site www.segger.com
or contact us at info@segger.com
Last update:
December 7, 2007
|